Tutorial: Mars One
From Kerbal Space Program Wiki
Mars One is a planned mission to mars to set up a permanent settlement there.
Contents
Mars One rover
The Mars One rover will be launched in 2018 to move the modules together and find a good place to settle.
Ship Design
- 1x OX-STAT Photovoltaic Panels
- 1x Probodobodyne RoveMate
- 1x Advanced Grabbing Unit
- 1x 2HOT Thermometer
- 1x Communotron 16
- 1x Sensor Array Computing Nose Cone
- 1x Materials Study
- 1x RoveMax Model 3
Life Support and Crew Habitat
We currently have no life support units or inflatable habitats.
Mars Transit Vehicle
The mars transit Vehicle will send the people to mars in 2024 getting there in 2025.
Ship Design
- 1x Mk1-2 Command Pod (upside down)
- 1x Mk1 Lander Can
- 1x Clamp 'O Tron Docking Port
- 1x Clamp 'O Tron Docking Port
- 1x Radial Engine Body
- 1x TVR-200 Stack Bi-Coupler
- 2x Rockomax X200-32 Fuel Tank
- 2x Kerbodyne KR-2L Advanced Engine
First you launch the Mk1-2 Command Pod and Mk1 Lander Can and the Clamp O' Tron Docking Port. Then you launch the rest and connect it in orbit after you transfer the one man crew in the Mk1 Command Pod you should include in the rocket that launches the lower part (but separate after docking and transferring the crew from the Mk1 Command Pod you seperated to the Mk1 Lander Can.